Recent Projects
Lower Bristol Road
Bristol
A 335 bedrooms student accommodation project (PBSA) . Upon completion, the development will offer 215 cluster flats and 120 studios.
We installed 1,325m² of Senior Aluminium SPW 600 windows and 667m² of Senior SF 52 fully capped curtain wall, the Jack Alumimium TD 68 commerical door was installed to all entrance and exits, all compliant with PAS 024. The plant room and louvre areas we used the Senior SD non thermally broken system.
The openings vents were inward opening and the Senior louvre guard system was installed in front of the opening vents
We installed 1,325m² of Senior Aluminium SPW 600 windows and 667m² of Senior SF 52 fully capped curtain wall, the Jack Alumimium TD 68 commerical door was installed to all entrance and exits, all compliant with PAS 024. The plant room and louvre areas we used the Senior SD non thermally broken system.
The openings vents were inward opening and the Senior louvre guard system was installed in front of the opening vents
Contractor: Watkin Jones
Order Value: £1,800,000
Access: Scaffold
Completed: Due completion summer 2024
See Other Projects