Company Reference from Watkin Jones

We began working with Andrew and the former Continental Installations team back in 2007 and for the past 18 months with him and Ray as part of their new venture R & A Installations Ltd. In that time, we have found them to be an honest and professional company.

A company priding themselves in their collaborative approach from pre-contract advice, subcontract negotiation, installation, prompt attention to snagging and non-confrontational approach to settling their account.

We have benefitted from their high-rise and large project experience and used their knowledge in product choices, detailing and access decisions on many of our PBSA projects across the country.

I would have no reservations about recommending R & A Installations Ltd for any type of project.

Graham Davies – Managing Director Watkin Jones Group

Dalby Avenue

Bedminster

A 819 bed scheme ranging from six to ten storeys in height across three buildings. Currently nearing completion we have installed 2,450m² of SPW 600 windows with inward opening vents, an aluminium perforated feature panel was insalled to the external of the opening vent, giving the building a stunning appearance.

To compliment the windows we installed 2,960m² of Senior SF 52 fully capped curtain wall, including full heigh screens with feature panel.

The ground floor doors are Jack Aluminium TD68 commercial door was installed at ground floor all installed to PAS 024 standards with panic and remote access ironmongery, we also installed auto swing and auto slide doors to the commercial units.

Contractor: Watkin Jones

Order Value: £3,700,00

Building Height:

Completed: Due completion summer 2024

Gallery

Bath Lane

Leicester

A 462 bed student scheme in Leicester, R&A installed 4,600m2 of Senior SPW 600 windows and SF 52 fully capped curtain wall. The opening window vents include the Senior Louvre guard feature with an inward opening vent behind a decorative louvre screen.

The windows were installed from standing scaffold & mast climbers

This project is completed and we look forward to working with Watkin Jones again in the near future.

Contractor: Watkin Jones

Order Value: £2,400,000

Building Height: 12 stories

Access: Cradles & MEWP’s

Completed: 2020

Gallery

Steelworks

Sheffield

A mixed scheme of 691 student beds and 71 build to rent flats at Steelworks House on Rockingham Street, Sheffield. Consisting of 6 blocks around a central courtyard, R&A installed 5,800m2 of Senior SPW 600 windows and SF 52 fully capped curtain wall, from standing scaffold & mast climbers.

The project was completed in 2022.

Contractor: Watkin Jones

Order Value: £3,500,000

Building Height: 12 stories

Access: Scaffold, Mast Climbers & MEWP’s

Completed: 2022

Gallery

Hollis Croft

Sheffield

This development is arranged in three distinct blocks ranging in height from 6 to 18 storeys and includes 972 beds of student accommodation, commercial units and Hub Space. R&A installed 5,465m2 of Senior SPW 600 windows and SF 52 fully capped curtain wall.

The windows were installed from standing scaffold & mast climbers

After completion Watkin Jones were happy with our performance and we awarded the Steelworks project.

Contractor: Watkin Jones

Order Value: £2,400,000

Building Height: 18 stories

Gallery

Frederick House

York

A Student Accommodation scheme with Watkin Jones. This scheme provides a total of 368 bedrooms in new 6 purpose-built accommodation blocks which includes the existing Guard House, repurposed into a social and study area. R&A installed 1,380m2 of Senior SPW 600 windows, from standing scaffold. The project was completed in 2022.

Contractor: Watkin Jones

Order Value: £950,000

Building Height: 3 stories

Completed: 2022

Gallery

Iona Street

Edinburgh

Located in the heart of Scotland's capital, Vita Student Iona Street Edinburgh was a challenging project which we delivered for Watkin Jones.

Consisting of four blocks we installed 1,149m² of SPW 600 windows including the Senior louvre guard in front of the opening vents, 381m² of Senior SF 52 fully capped curtain wall including the Jack aluminium commercial door, all to PAS 024 security standards.

Contractor: Watkin Jones

Order Value: £1,000,000

Building Height:

Completed: 2023

Gallery

Lower Bristol Road

Bristol

A 335 bedrooms student accommodation project (PBSA) . Upon completion, the development will offer 215 cluster flats and 120 studios.

We installed 1,325m² of Senior Aluminium SPW 600 windows and 667m² of Senior SF 52 fully capped curtain wall, the Jack Alumimium TD 68 commerical door was installed to all entrance and exits, all compliant with PAS 024. The plant room and louvre areas we used the Senior SD non thermally broken system.

The openings vents were inward opening and the Senior louvre guard system was installed in front of the opening vents

Contractor: Watkin Jones

Order Value: £1,800,000

Building Height:

Access: Scaffold

Completed: Due completion summer 2024